Version 2 [redesigned in 2009]
Due to the bank and resulting economic crisis of 2008 and the absolute impossibility of getting a construction loan anywhere near the planned budget, the project was redesigned. Three principles guided the effort: all parts of the house should be available at Home Depot, detailing was as simple as possible allowing the contractor to determine the best way to meet the budget, real sustainable techniques were out with standard construction and structural systems used in their place. The form of the home remained - in essence - unchanged.