View from the road below of the new retaining walls. The hole in the middle is for the concrete retaining walls that will bridge large sewer lines below.
Malcolm Drilling taking over the street below.
The first steel piles in place. Each w24x pile is some 50' long.
Big equipment on a steep slope - stand clear.
View from below - hillside work finally gets going (the rains are done!)
Rebar cages for the house's piles - a total of six piles will be placed by Malcolm as compensation to the Owner's for the use of their site.
A small little crane up on top of the hill - set up on the uphill neighbor's lot.
A view from the NE corner of the Owner's lot - the dirt in this view is all 'new', compacted dirt, filling in where the slide happened.
More shots of the cranes - not your typical residential work equipment.