The exposed CMU wall going up.
8x16x12 CMU blocks ... definitely a two person job.
A detial shot of the framing at the opening from the entry vestibule into the first floor hallway.
Setting floor joists at the pantry.
Look Ma, no hands! (Good balance!)
Floor joists in for the second floor, here at the garage looking towards the balance of the house.
One floor joists spans from outside wall to outside wall, both here and on the roof. This will help make the floor stable and keep the roof pitch consistent.